Supply Chain and Materials Management

Linear entity studies are material-intensive, and it's often difficult to track where that material is going. At Minerva, supply chain objects are also linked to lines and segments.

  • Demand and purchasing. The demand for materials opened for a job in a particular segment is associated with that segment.
  • Stock and shipment. The distance traveled by materials shipped to the site is tracked.
  • Consumption. The cost of pipes, coatings, fillers, and spare parts consumed is added to the cost of the relevant segment.
  • Contractor and subcontractor. Records are kept showing which contractor performed which section, along with progress payments and warranty tracking.
  • Traceability. Batch and certification information of the materials used can be associated with the segment.

The most valuable outcome of this connection is that when a problem arises later in a batch of material, you can instantly find out which kilometers of the line that batch was used on . Without this information, the only thing to do is to scan the entire line.